File #: AC 19-011    Version: 1 Name: ALUC-19-04 (Mount Calvary Baptist Church)
Type: ALUC-Document Status: ALUC-Regular-NW
In control: Airport Land Use Commission
On agenda: 3/14/2019 Final action:
Title: Workshop to receive a presentation from the Mount Calvary Baptist Church (MCBC) (ALUC-19-04) for a proposed religious campus located on the north side of Petersen Road, 1/2 mile east of Walters Road. The project will require a consistency determination from the ALUC at a later date with the Travis Air Force Base Land Use Compatibility Plan (Sponsor: City of Suisun City)
Attachments: 1. A - ALUC Application, 2. B - Current MCBC Site Plan11-27-2018, 3. C - Travis Context Map, 4. D - Prior MCBC Conceptual Master Plan 2016
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

title   

Workshop to receive a presentation from the Mount Calvary Baptist Church (MCBC) (ALUC-19-04) for a proposed religious campus located on the north side of Petersen Road, ½ mile east of Walters Road. The project will require a consistency determination from the ALUC at a later date with the Travis Air Force Base Land Use Compatibility Plan (Sponsor: City of Suisun City)

 

 

body

Recommendation

Staff recommends that the Commission receive the presentation. This is not an action item and no formal action will be taken at this hearing. Individual Commissioners may wish to express their views on the material presented.

Introduction

The Mount Calvary Baptist Church (MCBC) is proposing to develop a multi-purpose religious campus on Peterson Road, 1000 feet east of Walters Road in the City of Suisun City (See Attachment A: ALUC Application). The project includes the construction of a Sanctuary, Education Center and a Senior Affordable Housing project as well as a Business Center, a Family Life Center, Personal Storage Units, and a Conference and Banquet Center (See Attachment B: Site Plan). The project is located within the Area of Influence of the Travis Air Force Base Land Use Compatibility Plan (Travis Plan) within Compatibility Zone C (See Attachment C: Travis Context Map).

 

MCBC previously appeared before the Commission on March 10, 2016 with an earlier conceptual site plan (See Attachment D: Prior Site Plan). 

 

Staff has recommended this workshop as a means of presenting an update to the Commission on some changes to the project since it was last presented. 

 

DISCUSSION

 

The Mount Calvary Baptist Church is working with the City of Suisun City to design the above mentioned multi-purpose campus on lands located on the north side of Peterson Road, 1000 feet east of Walters Road. The property is entirely within Compatibility Zone C. The land use criteria for Compatibility Zone C are listed in the Table below.

 

Travis Plan Requirements

 

TABLE I:  Compatibility Criteria for Compatibility Zone C

 

                                     ZONE:  C                      

                            LOCATION:   Traffic Pattern,

             IMPACT ELEMENTS:   Safety and Overflight risk and noise impacts

         MAXIMUM DENSITIES

                                     Residential:   11 dwelling units per acre

                                     Other Uses:   75 persons per acre (indoors)

               100 persons per acre (outdoors)

               300 persons per acre (single acre)

 

Previous Presentation to ALUC on March 10, 2016

 

MCBC previously appeared before the Commission on March 10, 2016 with an earlier conceptual site plan.  Based on the compatibility criteria for Compatibility Zone C, the following components of the project required policy interpretations by the Commission:

 

                     The Main Sanctuary (Concentrations of People Interpretation),

                     The Education Center (Concentrations of People and Land Use Suitability), and

                     The Senior Affordable Housing Project (Land Use Suitability)

 

Policy Considerations from the March 10, 2016 Presentation

 

Main Sanctuary

 

One of the considerations addressed through compatibility planning is the safety of persons on the ground. This is generally controlled by restricting the number of persons per acre permitted by various land uses. These land uses are listed in Table 1 of the Travis Plan and, while not defined, are sometimes qualified with footnotes. For non-residential land uses, this restriction is expressed as a limitation on the number of people per acre allowed indoors and the number of people per acre allowed outdoors. Table 1 assumes that these land uses are occupied on a full-time basis and the Plan makes no provision for land uses which are seasonal or limited-term occupancy. For residential uses, the plan uses dwelling units per acre as a proxy for the number of people per acre.

 

The City of Suisun City has submitted information to address these issues and asked the Commission for clarification of the compatibility factors as to how they might apply to the church’s proposed development The City asked how the population intensity limitations might apply to a part-time use of the land (Main Sanctuary Building and Educational Center) and whether or not the Educational Center and the Senior Affordable Housing Project fall into the category of prohibited uses.

 

For those land uses with part-time or limited term occupancy, the City proposed that a person-hours equivalency be developed to compare limited term uses to a full-time use of the land. For example, if a business were open on Mondays only and occupied with 100 persons per acre it might have 1,000 person-hours per acre of intensity (100 persons per acre*10 hours occupancy on 1 day only). A full-time business with 100 persons per acre might have 7,000-person hours per acre (100 persons per acre*10 hours per day*7 days per week).

 

 

Educational Center

 

MCBC is proposing an education center on its campus. The Travis Plan prohibits schools. The education center raises a land use suitability question as to whether the education center is a school and thus prohibited or another land use type.

 

MCBC pointed out that the educational center is not a children’s school as defined by the Travis Plan. The Plan defines a children’s school as serving students up to and through the 12th grade. This implies that the school is providing mandated education for grades K-12. The MCBC Sunday School does not provide these services, but rather engages in religious training for students while parents are attending other church functions, and, as such, should not be included in the category of prohibited uses.

 

 

Senior Affordable Housing Project

 

The Senior Affordable Housing Project contained 88 dwelling units on 8 acres of land for a density of 11 units per acre. This density is consistent with the Travis Plan compatibility criteria for residential uses which is 11 units per acre.

 

The project is age restricted and will be occupied by senior citizens. The Travis Plan prohibits nursing homes and other land uses where the occupants would include the elderly. This senior project is not an assisted-living or elder-care facility. There are no medical or nursing services provided as a part of the housing. MCBC believes that this facility does not fall into the class of land uses which are prohibited under the compatibility criteria for Zone C.

 

For these reasons, the City of Suisun City was asking the Commission to determine if this methodology for addressing part time land uses is consistent with the Travis Plan.

 

 

The minutes from the March 10, 2016 ALUC meeting reflect that the Commission was comfortable with the matters presented by MCBC.

 

CURRENT PROPOSAL

 

The current proposal (See Attachment B Site Plan) contains the same elements as the last plan plus an area devoted to private storage units, as follows:

 

                     The Main Sanctuary (80,000 SF),

                     The Education Center (60,000 SF),

                     The Senior Affordable Housing Project (72 units),

                     The Family Life center (80,000 SF),

                     The Conference Center and Banquet Hall (22,000 SF),

                     The Business Center (10,000 SF), and

                     360 Private Storage Units

 

The major difference between the current and past proposal is that the current proposal includes an area of seasonal wetlands along the Petersen Road frontage which has been set aside for preservation. As a result, the area devoted to the religious campus has been reduced in size.

 

In addition, the senior housing project has been moved to the western side of the property from the eastern side which increases its distance from the end of the runway. There are also 360 private storage units on the northern side of the property which was previously depicted as “future development”.

 

The applicant has filed the required consistency determination application for this project and desires to utilize the informal presentation step to update the Commission on the progress made on the project prior to asking for the formal consistency determination at a later date.

 

RECOMMENDATION

 

Staff recommends that the Commission receive a presentation from the Mount Calvary Baptist Church (MCBC) (ALUC-19-04) for a proposed religious campus located on the north side of Petersen Road, ½ mile east of Walters Road. The project will require a consistency determination from the ALUC at a later date with the Travis Air Force Base Land Use Compatibility Plan (Sponsor: City of Suisun City)

 

Attachments

 

Attachment A: ALUC Application

Attachment B: Site Plan

Attachment C: Travis Context Map

Attachment D: Prior Site Plan